Rising Up: Watch Our Library’s First Walls Take Shape

The new Lake Stevens Library is taking shape! Watch your library start to rise before your eyes:

Highlights of our recent progress:

  • Shear walls and foundation are nearly done, with the building’s concrete slab poured.
  • Steel columns and beams are on-site, and cross-laminated timber pieces are being made.
  • Furniture plans are near completion, and samples are being shared with staff.
  • Fun, interactive features for the children’s and teen areas are being planned.

The two-story, 15,000-square-foot building is inspired by community input and is on track for completion in spring 2026.